Aon Fire Protection - Sprinkler Certification & Technical Notes
The Sprinkler Contractor Certification - Application & Renewal Pack "Form 7" can be downloaded below.
Applications must be filled in electronically using Adobe Acrobat Reader DC, which can be downloaded here. Hand written or scanned copies will not accepted. Email the completed application and all supporting documentation to nz.ssc@aon.com and cc: info@fpanz.org subject line: "Sprinkler certification YOUR COMPANY NAME"
Please ensure all required information is completed and supporting documentation is also included with your application or renewal.
Aon Sprinkler Certification Technical Notes
The following Technical Notes are supplied by Aon. Any comments or questions on these should be sent directly to nz.ssc@aon.com
- All current Aon Technical notes pack 2024
- Technical Note: 21-56 - Alternative Design Criteria (Rev. 1)
- Technical Note: 21-55 - Pre-Action, Dry Pipe and Deluge Systems Electronic Detection (Rev. 1)
- Technical Note: 21-55 - Pre-Action, Dry Pipe and Deluge Systems Electronic Detection (Rev. 1.1)
- Technical Note: 21-54 - Scheme A and In-Rack Storage Mode Head Placement (Rev. 1)
- Technical Note: 21-51 - Meeting Pods (Rev. 2)
- Technical Note: 21-51 - Meeting Pods (Rev. 1.1)
- Technical Note: 21-52 - Pump Test Orifice Plates Safety Warning (Rev. 1)
- Technical Note: 21-50 - Off-shore Modular Construction Remote Inspections (Rev. 1)
- Technical Note: 20-48 - Listing of Gravity Pipe Supports (Rev. 1.01)
- Technical Note: 20-46 - Pipe Attachments to Fire Water Tanks (Rev. 1)
- Technical Note: 20-49 - Window Sprinklers (Rev. 1)
- Technical Note: 20-45 - Pump House Pipe Work Design (Rev. 1.1)
- Technical Note: 20-44 - Pneumatic Pressure Tests (Rev. 1)
- Technical Note: 20-43 - Managed Evacuation Systems & NZS4541:2020 (Rev. 1)
- Technical Note: 20-41 - Requirement for a Building Consent (Rev. 1)
- Technical Note: 19-40 - External Transformer Fire Protection (Rev. 1)
- Technical Note: 19-39 - Sprinklers in Wardrobes (Rev. 1)
- Technical Note: 18-37 - Flow Testing Considerations (Rev. 1)
- Technical Note: 17-36 - Jet Fans (Rev. 1)
- Technical Note: 09-01 - Flexible Dropper Assemblies (Rev. 4)
- Technical Note: 09-01 - Flexible Dropper Assemblies (Rev. 3)
- Technical Note: 17-35 - Challenging Ceilings (Rev. 1)
- Technical Note: 17-34 - System Documentation Guidance (Rev. 1)
- Technical Note: 17-33 - Diesel Engine Throttle Controllers (Rev. 1)
- Technical Note: 17-32 - Mechanical Couplings (Rev. 1)
- Technical Note: 17-31 - Car Park Storage Lockers (Rev. 1)
- Technical Note: 16-28 - Certification of Sprinkler Systems (Rev. 1)
- Technical Note: 16-29 - Compliance with Standards (Rev. 1)
- Technical Note: 16-30 - Storage Declarations (Rev. 1)
- Technical Note: 16-20 - Hydraulic Allowances (Rev. 2)
- Technical Note: 16-27 - 200mm Pipe (Rev. 2)
- Technical Note: 16-26 - Insulation Sagging (Rev. 1)
- Technical Note: 16-24 - Fire Sprinkler System Valve Overhaul (Rev. 1)
- Technical Note: 16-25 - Valves with Supervisiory Devices (Rev. 1)
- Technical Note: 16-23 - Diesel Pump Rroom Ventilation (Rev. 1)
- Technical Note: 16-22 - Listed Equipment (Rev. 1)
- Technical Note: 16-22 - Appendix Hardware Requiring Listing (Rev. 1)
- Technical Note: 16-21 - Sprinkler System Water Supply Installations (Rev. 1)
- Technical Note: 15-19 - Strainer Listings and Listing Procedures (Rev. 1)
- Technical Note: 15-17 - Newsletter (Rev. 1)
- Technical Note: 15-17 - Concealed Plate Heads (Rev. 1)
- Technical Note: 15-16 - Application of Alternative Standards (Rev. 1)
- Technical Note: 15-15 - Sprinkler System Compliance Certificates (Rev. 1)
- Technical Note: 16-20 - Hydraulic Allowances (Rev. 1)
- Technical Note: 14-12 - Water Supply Tests Guidance For Inspection Personnel (Rev. 1)
- Technical Note: 14-14 - Sprinkler Systems and NSZ4219 (Rev. 1)
- Technical Note: 14-13 - Pipe Work Fabrication Standards (Rev. 1)
- Technical Note: 14-11 - Diesel Fire Pump Batteries (Rev. 1)
- Technical Note: 13-10 - NZS4541 Part 11 Precautions to be Taken When an Installation is Rendered Inoperative (Rev. 1)
- Technical Note: 12-09 - Fire Service Inlets Connections (Rev. 1)
- Technical Note: 11-08 - Fire Fighting Water Supplies NZS4541 2007 Clause 604.1.8.2 (Rev. 1)
- Technical Note: 11-08 - Attachment
- Technical Note: 11-06 - Pump Shaft Flexible Couplings (Rev. 1)
- Technical Note: 09-04 - Water Storage Tanks Sesimic Design (Rev. 2)
- Technical Note: 09-05 - Potentially Faulty Sprinklers (Rev. 1)
- Technical Note: 09-01 - Flexible Dropper Assemblies (Rev. 2)
- Technical Note: 09-03 - Degradation of Water Supplies Signing of Form 12a (Rev. 1)
- Technical Note: 08-02 - Reporting on New Installation Inspections (Rev. 2)